Two hydropower plants: Mulungushi Power Station and Lunsemfwa Power Station, with a combined generation capacity of 56 MW. The Mulungushi and Lunsemfwa Power Stations are from 1925 and 1945, respectively, and are in need of replacement. Our Senior Consultant, Martin Lacey, had provided his support as a Project Director throughout the refurbishing period. From mobilisation, installation and commissioning, working in multidisciplinary team to bring both station back to operation on time